III Godavari Railway Bridge, Rajahmundry, AP

Year of Construction: 1997
Owner/Client: South Central Railway
Our Service: Bow – String Arch Bridge 28 spans, 97.5 m each span, 2731.5 m total length
Scope of Work: Design, Fabrication & Operation of Cantilever Form Traveler for Arch; Post Tensioning for Bridge; Supply, Erection, Stressing & Grouting of Hanger Cables; Erection & Stressing of Temporary Stays; Design, Supply & Installation of Pot Bearings.
Main Contractor: South Central Railway
Consultant: CEPAS Plan SA.